TotalEnergies Jumper Connector Recovery
West Africa, CongoC1-24 Chopsaw1,050m
1 hr 15 min
Avg Cut Time
5
Cuts/Blade
1,050m
Water Depth
Project Overview
Decom Engineering provided specialized equipment and technical support for a subsea jumper connector recovery project in West Africa. The scope involved cutting insulated 6" Duplex flowline at each end of the jumper at 1,050m water depth. The C1-24 was deployed via ROV with hotstabs, achieving precise cuts with an average time of 1 hour 15 minutes per cut and up to 5 cuts per blade.
Key Highlights
- Deep-water ROV deployment at 1,050m with hotstab connection
- Precise cuts on insulated 6" Duplex flowline
- Remote technical support provided throughout the operation