Back to Case StudiesDecommissioning

Stybarrow Flexible Flowline

Stybarrow Fields, AustraliaC1-24 Chopsaw850m

3 min

Avg Cut Time

100+

Total Cuts

850m

Water Depth

Project Overview

Decom Engineering was engaged by MMA Offshore for Woodside's Stybarrow decommissioning campaign, requiring precise cutting of a 4" flexible flowline at 850m to enable safe recovery and NORMs inspection. C1-24 units 102 and 108 were crane deployed and ROV powered with Decom-supplied hotstabs, completing over 100 cuts with an average time of just 3 minutes and a rapid 10-minute cut-to-cut cycle at 12-metre spacings.

Key Highlights

  • 100+ clean cuts enabling immediate NORMs inspection
  • 10-minute cut-to-cut cycle across 12-metre spacings
  • C1-24 fleet (units 102 & 108) with Decom-supplied hotstabs

Project Gallery

Stybarrow Flexible Flowline - image 1
Stybarrow Flexible Flowline - image 2
Stybarrow Flexible Flowline - image 3
Stybarrow Flexible Flowline - image 4
Stybarrow Flexible Flowline - image 5
Stybarrow Flexible Flowline - image 6
Stybarrow Flexible Flowline - image 7
Stybarrow Flexible Flowline - image 8
Stybarrow Flexible Flowline - image 9
Stybarrow Flexible Flowline - image 10
Stybarrow Flexible Flowline - image 11
Stybarrow Flexible Flowline - image 12
Stybarrow Flexible Flowline - image 13