TRACS-32
Cut and Recover Large-Bore Pipelines
Decom Engineering's TRACS-32 (Twin Recovery & Cutting System) is a crane-deployable system for cutting and recovering pipelines up to 32" in diameter from the seabed. Robust pipe grabs secure the line while the integrated C1-32 Chopsaw cuts it during recovery, in lengths of up to 12.5m, with sections of up to 20m recovered.
Technical Specifications
Key Specs
1" - 32" Cutting | 20Te Lift
Dimensions (with C1-32)
14,479mm x 2,714mm x 3,428mm
Weight in Air
14,090 kg
Weight in Water
12,250 kg
SWL
20 Te payload; 32 Te maximum gross
Hydraulic Requirements
150 L/min @ 210 bar
Cutting Capacity
1" - 32" (25.4mm - 813mm)
Cut Length
Up to 12.5m
Pipeline Recovery
Sections up to 20m
Blade Diameter
2,100mm, 144 replaceable tips
Nominal RPM
20
On-Deck Skid
Supplied, 6,400 kg
Features
- Crane deployable for easy subsea operation
- Robust pipe grabs to secure the line for recovery
- Quick connect C1-32 Chopsaw, detachable for independent use
- 144 individually replaceable blade tips
- Designed to DNV 2.7-3, with on-deck skid supplied
- Optional backstop for precise cut lengths
Benefits
- Cutting during recovery streamlines operations and reduces time offshore
- Deployed and recovered by AHC crane, with the ROV assisting positioning
- ROV grab bars for precise tool positioning
- Flexibility with ROV or topside control package power options
Applications
ROV, Deployment & Control
Deployment Method
Deployed and recovered by AHC crane, with the ROV assisting positioning on the pipeline.
ROV Handling
ROV grab bars for precise tool positioning.
ROV Power
ROV-operated, with a hydraulic supply of 150 L/min at 210 bar.
Topside Alternative
Topside control package and downlines where no ROV power is available.