Back to All Tools
Lifting Solution

10Te Single Grab

Pipeline & Flowline Recovery

The Decom Engineering 10Te Single Grab is a subsea recovery tool for pipelines up to 20m long, with diameters from 2" to 40". Ideal for decommissioning operations, the crane-deployable tool recovers sections and returns them to the deck or relocates them to a subsea basket, with a heavy duty pipe grab rated to a 10 tonne safe working load.

10Te Single Grab - 3D render

Technical Specifications

Pipe Diameter

2" - 40" (50.8mm - 1,016mm)

Pipe Length Handled

Up to 20m

SWL

10 Te

Pipe Suitability

Rigid and flexible pipelines and risers, single and bundled

Dimensions

2,592mm x 1,174mm x 1,255mm

Weight in Air

Approx. 1,250 kg

Weight in Water

Approx. 1,112 kg

Hydraulic Requirements

50 L/min @ 210 bar

Features

  • Crane deployable for easy subsea operation
  • Heavy duty grab for handling coarse or bulky materials
  • Load hold valve fitted as standard to ensure no dropped object
  • ROV grab bars at both ends and near the hot stab panel
  • Easily configured to suit project requirements

Benefits

  • Flexibility with ROV or downline power options
  • Simple, controlled ROV-assisted tool positioning
  • Sections returned to deck or relocated to a subsea basket
  • No dropped objects, with a load hold valve throughout

Applications

Pipeline and flowline recovery from seabedSubsea decommissioning operationsRigid and flexible pipelines/risersSingle and bundled pipelinesROV or topside control operation

ROV, Deployment & Control

Deployment Method

Crane deployable for easy subsea operation.

ROV Interface

Operable via ROV or downline, with a hot stab panel for ROV connection.

ROV Handling

ROV grab bars at both ends and near the hot stab panel for positioning and stabilisation.

Topside Alternative

Operable via downlines where no ROV work pack is available.

Configuration

Easily configured to suit project requirements.

Safety

Load hold valve fitted to ensure no dropped object.

Gallery

10Te Single Grab in Detail