10Te Single Grab
Pipeline & Flowline Recovery
The Decom Engineering 10Te Single Grab is a subsea recovery tool for pipelines up to 20m long, with diameters from 2" to 40". Ideal for decommissioning operations, the crane-deployable tool recovers sections and returns them to the deck or relocates them to a subsea basket, with a heavy duty pipe grab rated to a 10 tonne safe working load.

Technical Specifications
Pipe Diameter
2" - 40" (50.8mm - 1,016mm)
Pipe Length Handled
Up to 20m
SWL
10 Te
Pipe Suitability
Rigid and flexible pipelines and risers, single and bundled
Dimensions
2,592mm x 1,174mm x 1,255mm
Weight in Air
Approx. 1,250 kg
Weight in Water
Approx. 1,112 kg
Hydraulic Requirements
50 L/min @ 210 bar
Features
- Crane deployable for easy subsea operation
- Heavy duty grab for handling coarse or bulky materials
- Load hold valve fitted as standard to ensure no dropped object
- ROV grab bars at both ends and near the hot stab panel
- Easily configured to suit project requirements
Benefits
- Flexibility with ROV or downline power options
- Simple, controlled ROV-assisted tool positioning
- Sections returned to deck or relocated to a subsea basket
- No dropped objects, with a load hold valve throughout
Applications
ROV, Deployment & Control
Deployment Method
Crane deployable for easy subsea operation.
ROV Interface
Operable via ROV or downline, with a hot stab panel for ROV connection.
ROV Handling
ROV grab bars at both ends and near the hot stab panel for positioning and stabilisation.
Topside Alternative
Operable via downlines where no ROV work pack is available.
Configuration
Easily configured to suit project requirements.
Safety
Load hold valve fitted to ensure no dropped object.
Gallery