Shenandoah Mooring Chain Cutting

Shenandoah Mooring Chain Cutting

Case Study: Shenandoah Location – Gulf of Mexico Client – Subsea 7 Operator – Beacon Offshore Energy In complex offshore environments, securing mooring infrastructure demands absolute safety. When Subsea7 prepared for the critical Shenandoah...
133mm Umbilical, Steel Rope outer

133mm Umbilical, Steel Rope outer

133mm Umbilical, Steel Rope Outer Back to Saw History Case Study 133mm Umbilical, Steel Rope Outer, Duplex Inner Pipes  Location: Havfram, Mauritania Water depth / onshore : Offshore Saw Used: C1-24 OD (mm): 133mm outer  WT (mm): N/A Located in Havfram, Mauritania,...
C1 Chop Saw -Thailand – Pipeline Cut and Lift

C1 Chop Saw -Thailand – Pipeline Cut and Lift

C1 Chop Saw – Thailand Pipeline Cut and Lift   Back to Case Studies Case Study Project Overview: Pipeline Cut & Lift Location: Thailand Client: James Fisher Offshore: Chevron, Erawan field Decom Engineering supplied specialized C1-12 and C1-24 chopsaw...