Jumper Connector Recovery

Jumper Connector Recovery

C1 Chop Saw – Subsea Jumper Connector Recovery Back to Case Studies Case Study Project Overview: Subsea Jumper Connector Recovery Location: Republic of Congo, Gulf of Guinea – West Africa Client: Total Energies Decom Engineering was engaged by Total Energies to...
FPSO Decommissioning

FPSO Decommissioning

C1 Chop Saw – FPSO Decommissioning Back to Case Studies Case Study Project Overview: FPSO Decommissioning Location: Petronas Chinguetti, Mauritania Client: Havfram Decom Engineering was engaged as the sole cutting contractor for the decommissioning of the...
133mm Umbilical, Steel Rope outer

133mm Umbilical, Steel Rope outer

133mm Umbilical, Steel Rope Outer Back to Saw History Case Study 133mm Umbilical, Steel Rope Outer, Duplex Inner Pipes  Location: Havfram, Mauritania Water depth / onshore : Offshore Saw Used: C1-24 OD (mm): 133mm outer  WT (mm): N/A Located in Havfram, Mauritania,...
508mm ROVCON Termination Head

508mm ROVCON Termination Head

508mm ROVCON Termination Head Back to Saw History Case Study 508mm ROVCON Termination Head, 6 inch Gas Injection Location: Havfram, Mauritania Water depth / onshore : Offshore Saw Used: C1-24 OD (mm): 508mm (internal 152mm) WT (mm): 35mm + 18mm Located in Havfram,...
20 inch ROVCON Termination Head

20 inch ROVCON Termination Head

20 inch, ROVCON Back to Saw History Case Study Offshore Cut Overview: 20inch ROVCON Termination Head, 10 inch production.  Location: Havfram, Mauritania Water depth / onshore : Offshore Saw Used: C1-24 OD (mm): 20in (internal 10in) WT (mm): 35mm + 22mm Located in...