Jumper Connector Recovery

Jumper Connector Recovery

C1 Chop Saw – Subsea Jumper Connector Recovery Back to Case Studies Case Study Project Overview: Subsea Jumper Connector Recovery Location: Republic of Congo, Gulf of Guinea – West Africa Client: Total Energies Decom Engineering was engaged by Total Energies to...
133mm Umbilical, Steel Rope outer

133mm Umbilical, Steel Rope outer

133mm Umbilical, Steel Rope Outer Back to Saw History Case Study 133mm Umbilical, Steel Rope Outer, Duplex Inner Pipes  Location: Havfram, Mauritania Water depth / onshore : Offshore Saw Used: C1-24 OD (mm): 133mm outer  WT (mm): N/A Located in Havfram, Mauritania,...