Thailand Pipeline Cut & Lift
Gulf of Thailand, Erawan FieldC1-12 & C1-24 Chopsaw80-100m
20 min
Avg Cut Time
600+
Total Cuts
40
Cuts/Blade
Project Overview
Decom Engineering supplied specialized C1-12 and C1-24 Chopsaw spreads for multiple large-scale pipeline decommissioning phases in the Gulf of Thailand. Over 600 cuts were successfully completed across various pipeline sizes, with an average of 40 cuts per blade. The operation covered 16" OD CWC-coated gas pipelines down to 8" pipelines.
Key Highlights
- Over 600 cuts completed across multiple campaign phases
- 40 cuts per blade across different pipeline sizes
- 24/7 technical support with dedicated project management