1 hr 30 min
Cut Time
1 blade
Blade Usage
150m
Water Depth
Project Overview
Decom Engineering was engaged to cut through a hardened steel accelerator rod embedded in extremely hard seabed. The rod could not be dredged below the mudline or pulled out, necessitating a precise cut at seabed level. Other tooling had failed, but the C1-24 completed the cut within the estimated 1.5-hour timeframe.
Key Highlights
- Completed cut where other tools had failed
- Precise cut at seabed level on embedded rod
- Single blade used for entire operation