BP Miller & Don Thick Wall CS Pipe

North SeaC1-24 ChopsawN/A

1 hr 30 min

Avg Cut Time

20

Total Cuts

12

Cuts/Blade

Project Overview

Decom Engineering partnered with DeepOcean for a thick wall 36mm OD carbon steel pipe cutting operation in the North Sea in May 2023. The C1-24 successfully completed 20 cuts with an average blade life of 12 cuts per blade, demonstrating robust capability in handling various wall thicknesses.

Key Highlights

  • 20 successful cuts on thick wall carbon steel pipe
  • 12 cuts per blade average demonstrating durability
  • Crane deployment with HPU reeler for precise positioning