Pipe Cutting CWC & Pipeline

Pipe Cutting CWC & Pipeline

Case Study: Pipe Cutting CWC & Pipeline Location – Gulf of Thailand Client – Claxton In March 2023, Decom Engineering undertook a significant decommissioning project for Claxton/ Intermoor on behalf of Chevron in the Gulf of Thailand. This project...
Brent Charlie Conductor Decommissioning

Brent Charlie Conductor Decommissioning

Case Study: Brent Charlie Conductor Decommission Location – North Sea, Brent Charlie Client – Allseas Decom Engineering was commissioned by Allseas to design and deliver a cutting solution tailored specifically for the decommissioning of steel conductors...
601mm SPU & FBE Coated Pipe

601mm SPU & FBE Coated Pipe

601mm SPU & FBE Coated Pipe Back to Saw History Case Study 601mm SPU & FBE Coated Pipe 406.4mm NB x 28.6mm WT, 601mm overall OD, API 5L X65 Grade, 1mm FBE +97mm SPU Location: Subsea 7, North Sea Water depth / onshore : 160m Saw Used: C1-24 OD (mm): 601mm WT...
133mm Umbilical, Steel Rope outer

133mm Umbilical, Steel Rope outer

133mm Umbilical, Steel Rope Outer Back to Saw History Case Study 133mm Umbilical, Steel Rope Outer, Duplex Inner Pipes  Location: Havfram, Mauritania Water depth / onshore : Offshore Saw Used: C1-24 OD (mm): 133mm outer  WT (mm): N/A Located in Havfram, Mauritania,...