Efficient Koscon and Mooring Chain Cuts

Efficient Koscon and Mooring Chain Cuts

Case Study: Efficient Koscon and Mooring Chain Cuts Location – Indian Ocean Client – Technip, Woodside In September 2023, Decom Engineering was engaged by Technip for a comprehensive cutting operation in the Indian Ocean, targeting flexi risers, mooring...
Barrow Island

Barrow Island

Case Study: Barrow Island Location – Barrow Island, Australia Client – Liberty Industrial Operator – Chevron Decom Engineering was engaged by Liberty Industrial to provide a cutting solution for Chevron’s decommissioning activities on Barrow Island....
Cutting of Thick Wall 350mm ODCS Pipe

Cutting of Thick Wall 350mm ODCS Pipe

Case Study: Cutting of Thick Wall 350mm OD CS Pipe Location – North Sea Client – Exceed / Deep Ocean Decom Engineering partnered with Deep Ocean for a significant pipe cutting operation in the North Sea, specifically targeting the decommissioning of thick...
Stybarrow Flowline

Stybarrow Flowline

Case Study: Stybarrow Flowline Location – Stybarrow Fields, Australia Client – MMA Operator – Woodside Decom Engineering was engaged by MMA to deliver a critical subsea cutting operation as part of Woodside’s decommissioning activities in the...
Stybarrow Mooring Chain

Stybarrow Mooring Chain

Case Study:StybarrowMooringChain Location – Stybarrow Fields, Australia Client – TechnipFMC Operator – Woodside Decom Engineering was contracted by TechnipFMC to support Woodside’s decommissioning campaign at the Stybarrow field, offshore Western...