Pipeline Cut & Lift

Pipeline Cut & Lift

Case Study: ProductionSpool Cuttingfor IMRworkscope Location – Shell Penguins, North Sea Client – Subsea 7, Shell Decom Engineering was engaged after the clientstruggled to complete successful efficinet cut trials with hydraulic shears and diamond wire...
C1-46 Carbon Steel & Super Duplex

C1-46 Carbon Steel & Super Duplex

Case Study: C1-46 Carbon Steel & Super Duplex Location – North Sea, Brent Charlie Client – Deep Ocean Decom Engineering played a pivotal role in a subseainfrastructure decommissioning project at the Brent Field in the Northern North Sea, where waters...
UKCS Risers, Carbon Steel & Duplex

UKCS Risers, Carbon Steel & Duplex

Case Study: UKCS Risers, Carbon Steel & Duplex Location – UK Continental Shelf (UKCS) Client – DeepOcean Operator – Shell Decom Engineering was selected by DeepOcean to support Shell’s decommissioning programme in the UK Continental Shelf. The...
Pipe Cutting CWC & Pipeline

Pipe Cutting CWC & Pipeline

Case Study: Pipe Cutting CWC & Pipeline Location – Gulf of Thailand Client – Claxton In March 2023, Decom Engineering undertook a significant decommissioning project for Claxton/ Intermoor on behalf of Chevron in the Gulf of Thailand. This project...
601mm SPU & FBE Coated Pipe

601mm SPU & FBE Coated Pipe

601mm SPU & FBE Coated Pipe Back to Saw History Case Study 601mm SPU & FBE Coated Pipe 406.4mm NB x 28.6mm WT, 601mm overall OD, API 5L X65 Grade, 1mm FBE +97mm SPU Location: Subsea 7, North Sea Water depth / onshore : 160m Saw Used: C1-24 OD (mm): 601mm WT...