Back to Case StudiesDecommissioning

Stybarrow Mooring Chain

Stybarrow Fields, WA, AustraliaC1-24 Chopsaw800m

8 min

Avg Cut Time

10+ cuts

Blade Life

800m

Water Depth

Project Overview

Decom Engineering was contracted by TechnipFMC to support Woodside's decommissioning campaign at the Stybarrow field. The C1-24 Chopsaw was crane deployed and powered subsea via ROV, with hotstabs supplied by Decom. The saw delivered industry-leading cut times of just 8 minutes per mooring chain link, completing all 24 cuts with consistent performance and minimal blade changes.

Key Highlights

  • Industry-leading 8-minute cut times per chain link
  • All 24 cuts completed with consistent performance
  • Operation remained ahead of schedule, reducing vessel time