Back to Case StudiesDecommissioning
Brent Charlie Conductor Decommissioning
North Sea, Brent CharlieC1-32-101 Chopsaw180m
1 hr
Avg Cut Time
180m
Water Depth
304
Tips Used
Project Overview
Decom Engineering was commissioned by Allseas to design and deliver a cutting solution tailored specifically for the decommissioning of steel conductors at the Brent Charlie platform. The custom-designed C1-32-101 Chopsaw was created for this project, handling 30" OD conductors containing internal flexi pipelines. The saw was neutrally buoyant and flown into position by a single ROV.
Key Highlights
- Custom C1-32-101 engineered specifically for this project
- Neutrally buoyant saw flown into position by single ROV
- Successfully cut conductor angled at 30 degrees where others failed