CASE STUDY

C1 Chop Saw – West Africa – Jumper Connector Recovery

LOCATION

West Africa

PRODUCTS

C1-24 Saw
Total Energies, Republic of Congo, Gulf of Guinea – West Africa

Decom Engineering provided a C1-24 Chopsaw and remote technical support to complete the cutting operation of a subsea jumper. The work scope included the cutting of the insulated 6″ Duplex flowline at each end of the jumper

PROJECT OVERVIEW

Material: 168.3mm Duplex – 14.3mm WT – Insulation OD 608mm.

Deployment Method: ROV – Hotstabs

Average Cut Time: 1 hour 15 mins

Blade: 1 cut per blade

Water Depth: 1050m

SOLUTION PROVIDED

Full Equipment and Service Solution

Additional Services: Hotstab Package; Independent Clamping System

-

pipeline cutting

CASE STUDY

C1 Chop Saw – West Africa – Jumper Connector Recovery

LOCATION

West Africa

PRODUCTS

C1-24 Saw
Total Energies, Republic of Congo, Gulf of Guinea – West Africa

Decom Engineering provided a C1-24 Chopsaw and remote technical support to complete the cutting operation of a subsea jumper. The work scope included the cutting of the insulated 6″ Duplex flowline at each end of the jumper

PROJECT OVERVIEW

Material: 168.3mm Duplex – 14.3mm WT – Insulation OD 608mm.

Deployment Method: ROV – Hotstabs

Average Cut Time: 1 hour 15 mins

Blade: 1 cut per blade

Water Depth: 1050m

SOLUTION PROVIDED

Full Equipment and Service Solution

Additional Services: Hotstab Package; Independent Clamping System

pipeline cutting

CASE STUDY

C1 Chop Saw – West Africa – Jumper Connector Recovery

LOCATION

West Africa

PRODUCTS

C1-24 Saw
Total Energies, Republic of Congo, Gulf of Guinea – West Africa

Decom Engineering provided a C1-24 Chopsaw and remote technical support to complete the cutting operation of a subsea jumper. The work scope included the cutting of the insulated 6″ Duplex flowline at each end of the jumper

PROJECT OVERVIEW

Material: 168.3mm Duplex – 14.3mm WT – Insulation OD 608mm.

Deployment Method: ROV – Hotstabs

Average Cut Time: 1 hour 15 mins

Blade: 1 cut per blade

Water Depth: 1050m

SOLUTION PROVIDED

Full Equipment and Service Solution

Additional Services: Hotstab Package; Independent Clamping System

pipeline cutting

EXCEEDING EXPECTATIONS

You’re in safe hands

Working to internationally recognised standards, Decom Engineering raises the benchmark within the pipe cutting industry.